Structural work
What holds a house up is built once.
Foundations, extensions, load-bearing wall openings, retaining walls. We come and look, we calculate, and we give you a written quote.
- Ten-year insurance
- 10 yrs
- Site visit
- 48 h
- Written quote
- 8 days
- On the tools
- 22 yrs

Calculated, then built
beams sized by an engineering office
01 What protects you
Structural work is covered for ten years. Here is how.
- Ten-year insurance
- For ten years after handover, it covers any damage that threatens the solidity of the work. The certificate comes with the quote.
- One-year completion guarantee
- For a year after handover, any defect you report is put right.
- Handover in writing
- We walk the site together and sign the handover report: that is the day your guarantees start.
- Your building damage insurance
- The law asks the owner to take out dommages-ouvrage insurance before an extension starts. We give your insurer the documents it asks for.
02 What we build
Our masonry work
House extension
A room on the ground floor, from the foundations to the walls ready for the roof, with the planning paperwork sorted before we dig.

Load-bearing wall opening
Open the kitchen onto the living room or create a bay window: propped, beam sized by an engineer, finished clean.

Concrete slab and foundations
Garage, terrace, garden shed or extension: footings and slabs poured on a sound base, reinforced and level.

Boundary and garden walls
Boundary walls, low garden walls and gate pillars, in block, brick or stone, rendered to match the house.

Facade renovation and render
Cracks repaired, stone repointed, render redone: the facade cleaned up and protected for years.

Retaining walls
Hold back a slope, create a level terrace or a driveway: a wall built to take the pressure of the ground.

03 From the first visit to the handover
How a job runs
1
Site visit and measurements
We come and see the site, take measurements and check the rules that apply: planning, co-ownership, access for the lorry.
2
Written quote
A detailed quote within a week, insurance certificate attached. Nothing starts until you have signed.
3
The works
A start date kept, a site tidied every evening, and a phone call if anything changes.
4
Handover
We check everything together and sign the handover report. Your guarantees start that day.
04 Past projects
Recent sites

Rezé, 2025
25 m² extension in concrete block
Rendered concrete block, 9 weeks

Nantes, 2025
Kitchen opened onto the living room
Steel beam, exposed brick, 4 days of structural work

Vertou, 2024
Stone boundary wall and porch
Local stone, lime mortar, 3 weeks

Carquefou, 2025
Garage slab and screed
Reinforced concrete, 5 days

Orvault, 2024
Stone facade repointed
Lime mortar, 2 weeks

Saint-Sébastien-sur-Loire, 2023
Rubble stone gate pillars
Rubble stone, concrete core, 4 days
05 Where we work
How soon we can come and measure
Carquefou
44470
visit within 3 days
La Chapelle-sur-Erdre
44240
visit within the week
Nantes
44000
visit within 48 h
Orvault
44700
visit within 3 days
Rezé
44400
visit within 48 h
Saint-Herblain
44800
visit within 48 h
Saint-Sébastien-sur-Loire
44230
visit within 48 h
Vertou
44120
visit within 3 days
06 After the handover
What our customers say
"We wanted to open the kitchen onto the living room. He came with the engineer's calculation for the beam, propped everything, and the dust stayed behind the plastic sheeting. Four days, as announced."
Claire M.
Load-bearing wall, Nantes
"For our 25 m² extension, he told us straight away that a prior declaration was enough and helped us fill it in. The quote did not move by a single euro."
Julien and Sarah D.
Extension, Rezé
"The old stone wall along the road was leaning. He rebuilt it with lime mortar, like the original, and three neighbours asked for his number."
Bernard L.
Stone wall, Vertou
Free, no obligation
Book a site visit
Structural work is never priced from a photo. Tell us where and what, we call you back to fix a time to come and measure.
02 61 91 24 38