All our work

Load-bearing wall opening

Open the kitchen onto the living room or create a bay window: propped, beam sized by an engineer, finished clean.

Starting price
from €2,500
Typical duration
2 to 4 days
Lead time
starts in 3 to 5 weeks

Removing part of a load-bearing wall is not demolition, it is transferring a load. The beam that replaces the wall is sized by a structural engineering office from the actual loads, and the wall is propped before a single brick comes out.

What is included

  • Visit and survey of what the wall carries
  • Beam calculation by a structural engineering office
  • Propping of the floors and roof above
  • Opening, steel or reinforced concrete beam, bearings
  • Making good of the reveals, ready for the plasterer
  • Dust protection and daily clean-up

The paperwork

Inside a house that is not a listed building, no planning permission is needed. A new opening in an outside wall changes the look of the building and requires a prior declaration to the town hall. In a block of flats, a load-bearing wall is a common part: the works must be authorised by the general meeting of co-owners before they start.

Good to know

Count two to four days of heavy work, then the time for the beam to be boxed in or plastered. We tell you in advance which days are noisy.

Ten-year insurance

Certificate attached to the quote and to the invoice.

One-year completion guarantee

For a year after handover, any defect you report is put right.

Loads calculated

Beams and tall retaining walls sized by an engineering office, never by eye.

Free, no obligation

Book a site visit

Structural work is never priced from a photo. Tell us where and what, we call you back to fix a time to come and measure.

02 61 91 24 38